1.
Which of the following term describes testing ?
2.
What allows different projects to use the same source files at the same time ?
3.
Which of the following is not a change management process ?
4.
How are baselines verified ?
5.
Quality also can be looked at in terms of user satisfaction which includes_____________________?
6.
Which of the following is a example of Configuration Items ?
7.
CCB stands for__________________?
8.
Inspections and testing are what kinds of Quality Costs ?
9.
Quality Management in software engineering is also known as_____________________?
10.
What information is required to process a change to a baseline ?
Read More Section(Software Engineering Mcqs)
Each Section contains maximum 70 questions. To get more questions visit other sections.
- Advanced Software Engineering Mcqs - (95)
- Architectural Design Mcqs for Software Engineering - (24)
- Basics of Software Engineering - (27)
- Dependability & Security Mcqs for Software Engineering - (48)
- Design & Implementation Mcqs for Software Engineering - (79)
- Requirement Engineering for Software - (80)
- Software Design Mcqs - (50)
- Software Engineering Types - (48)
- Software Evolution Mcqs - (82)
- Software Management Mcqs - (117)
- Software Metrics Mcqs - (37)
- Software Modelling Mcqs - (15)
- Software Processes, Models & Software Development Mcqs - (54)
- Software Reliability & Fault Tolerance Mcqs - (28)
- Software Testing & Quality Management Mcqs - (91)