1.
Which of the following structures are constructed parallel to shore line to develop a demarcating line between land area and water area ?

2.
Assertion A : Large size stones are required in stone revetment in shore protection. Reason R : Resistance of stone to wave force is proportional to its volume and wave force is proportional to the exposed area of the stone?
Select your answer based on the coding system given below

3.
Which of the following structures protects the shore by trapping of littoral drift?

4.
For designing the dock, the proportion of ship load assumed to be borne by keel blocks is________________?

5.
A ship is berthed in a chamber and lifted by principles of buoyancy Such a chamber is called_________________?

6.
A ship strikes the berth generally at an angle_________________?

7.
Which of the following conditions of loading imposes the greatest load on the foundation in case of dry docks?

8.
Which of the following are repair docks ?

9.
Which of the following type of sea walls results in greatest protection of shore structures?

10.
When a wave strikes a vertical breakwater in deep water, it is reflected back and on meeting another advancing wave of similar amplitude merges and rises vertically in a wall of water. This phenomenon is called_________________?